Rangitane Cultural Centre by Robinson Construction Ltd

Monday, 28 May 2012



Posted by Mark Watson - Robinson Construction Ltd at 19:22
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Blog Archive

  • ▼  2012 (43)
    • ►  November (2)
    • ►  October (3)
    • ►  September (6)
    • ►  August (3)
    • ►  July (4)
    • ►  June (7)
    • ▼  May (12)
      •  First frames on site Looking at the height...
      •  5.30am start for the last of the floors
      •  Pour number two begins  Lovely winter morning...
      •  Perfect day for concrete
      • Panels being installed by crane
      •  Panels being placed  Challenging in the rain ...
      •  Foundations poured ready for floors Mesh l...
      • Top photo is the first of the floors being pr...
      •  One of the precast panels being lifted after it...
      • Back filling has recommenced in preparation for ...
    • ►  April (6)

About Me

My photo
Mark Watson - Robinson Construction Ltd
View my complete profile
Picture Window theme. Powered by Blogger.