Rangitane Cultural Centre by Robinson Construction Ltd

Tuesday, 8 May 2012


Top photo is the first of the floors being prepped ready for pouring and the bottom photo is the other feature panel after it was poured this week, ready for finishing as the concrete sets.
Posted by Mark Watson - Robinson Construction Ltd at 20:53
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Blog Archive

  • ▼  2012 (43)
    • ►  November (2)
    • ►  October (3)
    • ►  September (6)
    • ►  August (3)
    • ►  July (4)
    • ►  June (7)
    • ▼  May (12)
      •  First frames on site Looking at the height...
      •  5.30am start for the last of the floors
      •  Pour number two begins  Lovely winter morning...
      •  Perfect day for concrete
      • Panels being installed by crane
      •  Panels being placed  Challenging in the rain ...
      •  Foundations poured ready for floors Mesh l...
      • Top photo is the first of the floors being pr...
      •  One of the precast panels being lifted after it...
      • Back filling has recommenced in preparation for ...
    • ►  April (6)

About Me

My photo
Mark Watson - Robinson Construction Ltd
View my complete profile
Picture Window theme. Powered by Blogger.